SOUTH
PENNINES INTEGRATED TRANSPORT STRATEGY
|
|||
The action plan has been translated into twelve statements which incorporate all aspects of the strategy. These statements are presented in Table 4 below.
TABLE 4: ACTION PLAN STATEMENTS
Partnership Working
Integrating transport - policies
Information and monitoring
Participation/consultation
Communication
Widening Travel Choice
CH1 Matlock-Buxton-Chinley railway re-instatement
CH2 Improvement of strategic bus services (PPTF sub group)
CH3 Trans-Pennine rail upgrade
Traffic management and demand restraint, including safety
TM1 A6/A52/A523 area traffic restraint/travel awareness/safety(PPTF sub group)
TM2 A6/A628 area traffic restraint/travel awareness/safety
TM3 A628/M62 area traffic restraint/travel awareness/safety
Planning and managing the highways network
H1 A628 Mottram-Hollingworth-Tintwistle
H2 A628/A616 selected, limited improvements
Sustainable distribution
F1 Liverpool-Lille via Woodhead (Central Railway)
F2 Freight management (PPTF sub group)
3.1 Assessment of progress
It is absolutely essential that an assessment is made of the achievements of the strategy. Many relevant targets already exist at National and local level, whilst National Performance Indicators are currently under review.
A distinction needs to be made between measures of performance (operational targets, most likely to be time- or process- related – e.g. two newsletters per year) and measures of achievement (outcome targets, representing the measurement of a change resulting from the application of specific initiatives – e.g. a percentage reduction in road accident casualties within a certain area). Both aspects will be covered as follows:
CH2 Bus service enhancements: new/improved bus services, new facilities for inter-modality, accessibility measures, cheaper fare structures, increased patronage.
TM Traffic management and demand restraint: reduced traffic growth within area, lower traffic speeds, increased compliance with speed limits, reduction in fatal/serious road accident casualties.
F2 Sustainable distribution: measures of freight transfer to rail.
3.2 Sequencing and timetable
The Action Plan statements have been set to a timetable until 2015 (see Table 6). The interdependence of initiatives is, however, of vital importance. SPITS represents a complete package of measures which will not necessarily be successful unless applied in the correct balance and sequencing. In particular, the inter-dependence of the traffic restraint measures and the A628/A616 improvements are sensitive. The sequencing of these measures is of greater importance than an actual timetable. A sequencing plan has therefore been devised which summarises the main phases of work. This is presented in Table 5 below.
|
PHASES |
00/01
01/02
02/03
03/04
04/05
05/06
06/07
07/08 |
TM – Traffic Restraint |
H - Highways |
|||||
|
A6/A52/A523 |
A6/A628 |
A628/M62 |
Mottram- Tintwistle |
Tintwistle- Stocksbridge |
||||
|
STAGE 1 approx. 2000/2003 |
Sub group |
NATA* |
||||||
|
Apply pilot measures if no predicted increase of traffic on A628 |
|
Green bridges pilot? |
||||||
|
Sub group |
Inquiry |
|||||||
|
STAGE 2A approx. 2003/2005 |
Inquiry |
Sub group |
Construction |
Route Management Strategy |
||||
|
Apply (further) measures |
Open |
|||||||
|
STAGE 2b approx. 2005/2008 |
Assess effects of measures |
Inquiry |
Selected limited improvements |
|||||
|
|
Apply measures |
Inquiry |
||||||
|
|
Apply measures |
|||||||
*New Approach to Appraisal
South Pennines Integrated Transport Strategy
|
STAGE 1 |
STAGE 2A |
STAGE 2B |
STAGE 3 |
|||||||||||||
|
Action Plan Statements |
1999/ 2000 |
2000/ 2001 |
2001/ 2002 |
2002/ 2003 |
2003/ 2004 |
2004/ 2005 |
2005/ 2006 |
2006/ 2007 |
2007/ 2008 |
2008/ 2009 |
2009/ 2010 |
2010/ 2011 |
2011/ 2012 |
2012/ 2013 |
2013/ 2014 |
2014/ 2015 |
|
Partnership Working: 1. Officer and Member meetings |
a |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
*
|
* |
* |
|
Partnership working: 2. sub groups |
a |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
|
|
Integrating policies: 3. Local Transport Plans x 6 |
a |
LTP 1 a |
Annual report |
Annual report DETR guide 2nd round |
Annual report draft LTP 2nd round |
Annual report |
Prep. LTP 2 |
Annual report |
Annual report |
Annual report |
Annual report |
Prep LTP 3 |
Annual report |
Annual report |
Annual report |
Annual report |
|
Integrating policies: 4. Regional Planning Guidancex4 E Mids Y&Humber NWest WMids |
|
p.exama p.exama p.exam |
p.exam |
Final |
||||||||||||
|
Integrating policies: 5. Multi Modal studies: SEMMS SWYMMS |
||||||||||||||||
South Pennines Integrated Transport Strategy
|
Action Plan Statements |
1999/ 2000 |
2000/ 2001 |
2001/ 2002 |
2002/ 2003 |
2003/ 2004 |
2004/ 2005 |
2005/ 2006 |
2006/ 2007 |
2007/ 2008 |
2008/ 2009 |
2009/ 2010 |
2010/ 2011 |
2011/ 2012 |
2012/ 2013 |
2013/ 2014 |
2014/ 2015 |
|
N-S corridor Midman (B’ham-M’chester) Trans-Pennine SEA Others as appropriate |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
||
|
Info. and monitoring 6.Research& Development TP High Gauge Study A6 Traffic restraint Strategic bus services Other studies |
a
£10,000 £10,000 £20,000 £20,000 |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
|
|
Info. and monitoring 7. Assess progress |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
||
|
Info. and Monitoring 8. Annual monitoring report |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
|||
|
Participation/ Consultation 9. As appropriate |
a |
* |
*
|
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
South Pennines Integrated Transport Strategy
|
STAGE 1 |
STAGE 2A |
STAGE 2B |
STAGE 3 |
||||||||||||||
|
Action Plan Statements |
1999/ 2000 |
2000/ 2001 |
2001/ 2002 |
2002/ 2003 |
2003/ 2004 |
2004/ 2005 |
2005/ 2006 |
2006/ 2007 |
2007/ 2008 |
2008/ 2009 |
2009/ 2010 |
2010/ 2011 |
2011/ 2012 |
2012/ 2013 |
2013/ 2014 |
2014/ 2015 |
|
|
Communication 10. Newsletter |
a (one) |
* (one) |
* (two) |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
|
|
Communication 11. Website |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
||
|
Integrated Transport Planning – projects |
|||||||||||||||||
|
12. Initiatives which address objectives |
a |
a |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
* |
|
|
CH Widening travel choice |
|||||||||||||||||
|
CH1 Matlock-Buxton railway |
a |
Feas-ibility Study |
open |
||||||||||||||
|
CH2 Strategic bus services (sub-group) |
|
a |
apply |
||||||||||||||
|
CH3 Trans-Pennine Rail upgrade |
open? |
||||||||||||||||
|
TM Traffic management and demand restraint/safety |
|||||||||||||||||
|
TM1 A6/A52/A523 Area traffic restraint |
Sub group |
Pilot prop- osals |
orders |
inquiry
|
apply |
||||||||||||
|
TM2 A6/A628 Area traffic restraint |
Sub group |
Pilot prop- osals |
orders |
inquiry |
apply |
||||||||||||
|
TM3 A628/M62 Area traffic restraint |
Sub group
|
Pilot prop-osals |
orders |
inquiry |
apply |
||||||||||||
|
South Pennines Integrated Transport Strategy Table 6: Action Plan Timetable (continued) |
|||||||||||||||||
|
Action Plan Statements |
1999/ 2000 |
2000/ 2001 |
2001/ 2002 |
2002/ 2003 |
2003/ 2004 |
2004/ 2005 |
2005/ 2006 |
2006/ 2007 |
2007/ 2008 |
2008/ 2009 |
2009/ 2010 |
2010/ 2011 |
2011/ 2012 |
2012/ 2013 |
2013/ 2014 |
2014/ 2015 |
|
|
H Planning and managing the highways network
|
|||||||||||||||||
|
H1 A628 Mottram-Hollingworth-Tintwistle |
a |
NATA |
Draft orders |
inquiry |
Start const-ruction |
open |
|||||||||||
|
H2 A628/A616 selected, limited improvements |
Green Bridges Pilot? |
Route M’ment Strategy |
assess and apply |
||||||||||||||
|
F Sustainable distribution
|
|||||||||||||||||
|
F1 Liverpool-Lille via Woodhead (Central Railway) |
App’n To DETR |
Local hearing |
Start Const-ruction 2003 |
open 2008 |
|||||||||||||
|
F2 Freight management (sub group) |
* |
* |
Apply Meas-ures |
||||||||||||||
KEY a action carried out
* action programmed